Input data and calculated levelised costs for comparison between the present study model and that of McCollum and Ogden [54]. The basis for cost is the year 2005. A CEPCI index for 2005 of 468.2 has been applied to achieve the same cost basis.
Parameter | Unit | Ref. [54] | This study |
---|---|---|---|
![]() |
tonnes/day | 5000 | |
Pin | bar | 1 | |
Pliq | bar | 73.8 | |
Pfinal | bar | 150 | |
Tin | °C | 40 | |
nstage | – | 5 | |
ϵcomp | – | 0.75 | |
Cost year | – | 2005 | |
CRF | – | 0.15 | |
O&M factor | – | 0.04 | |
Electricity cost | Euro/kWh | 0.065 | |
CF | – | 0.8 | |
LCOCC | USD/t CO2 | 10.99 | 11.63 |
O&Mvar | USD/t CO2 | 6.81 | 7.01 |
O&Mfixed | USD/t CO2 | 0.88 | 0.97 |
Annualised CAPEX | USD/t CO2 | 3.3 | 3.65 |
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.