Open Access
Table 10
Input data and calculated levelised costs for comparison between the present study model and that of McCollum and Ogden [54]. The basis for cost is the year 2005. A CEPCI index for 2005 of 468.2 has been applied to achieve the same cost basis.
Parameter | Unit | Ref. [54] | This study |
---|---|---|---|
![]() |
tonnes/day | 5000 | |
Pin | bar | 1 | |
Pliq | bar | 73.8 | |
Pfinal | bar | 150 | |
Tin | °C | 40 | |
nstage | – | 5 | |
ϵcomp | – | 0.75 | |
Cost year | – | 2005 | |
CRF | – | 0.15 | |
O&M factor | – | 0.04 | |
Electricity cost | Euro/kWh | 0.065 | |
CF | – | 0.8 | |
LCOCC | USD/t CO2 | 10.99 | 11.63 |
O&Mvar | USD/t CO2 | 6.81 | 7.01 |
O&Mfixed | USD/t CO2 | 0.88 | 0.97 |
Annualised CAPEX | USD/t CO2 | 3.3 | 3.65 |
Les statistiques affichées correspondent au cumul d'une part des vues des résumés de l'article et d'autre part des vues et téléchargements de l'article plein-texte (PDF, Full-HTML, ePub... selon les formats disponibles) sur la platefome Vision4Press.
Les statistiques sont disponibles avec un délai de 48 à 96 heures et sont mises à jour quotidiennement en semaine.
Le chargement des statistiques peut être long.