Table 2

Main parameters of cascade hydropower station.

Station number Unit number Capacity (MW) Water lag time (h) Traffic between scheduling periods (m³/s) Initial water level (m) Initial storage (m³)
1 1, 2, 3 31, 31, 31 53.4 30,81.5 866 × 104
2 4, 5, 6 22, 22, 22 1 222 2863 1232 × 105
3 7, 8, 9 25, 25, 13 1 226 2772 62 × 104
4 10, 11, 12 33, 33, 33 2 69.5 26,66.5 258 × 104
5 13, 14, 15 64, 64, 64 1 100 2525 63 × 105