Open Access
Numéro |
Sci. Tech. Energ. Transition
Volume 80, 2025
|
|
---|---|---|
Numéro d'article | 37 | |
Nombre de pages | 12 | |
DOI | https://doi.org/10.2516/stet/2025017 | |
Publié en ligne | 3 juin 2025 |
- Li Y, Li F, Zou Yu, Ma X, Lv Z, Wu X (2016) Construction safety and quality assessment of prefabricated concrete buildings, Build. Technol 47, 4, 305–309. https://doi.org/10.13731/j.issn.1000-4726.2016.04.004. [Google Scholar]
- Wang P (2019) Analysis of engineering project management and development of prefabricated buildings, Green Build. Mater. 6, 185–186. https://doi.org/10.16767/j.cnki.10-1213/tu.2019.06.139. [CrossRef] [Google Scholar]
- Ding S (2021) Research on the project management mode of the whole industry chain of prefabricated buildings based on BIM, Constr. Econ. 42, 8, 67–71. https://doi.org/10.14181/j.cnki.1002-851x.202108067. [Google Scholar]
- Chen K (2020) Analysis of problems and countermeasures in the development of prefabricated buildings, Econ. Res. Guide 9, 191–193+197. [Google Scholar]
- Li T, You X (2022) Analysis of factors affecting the quality of prefabricated buildings based on Apriori, Tongji Univ. Nat. Sci. Ed. 50, 2, 147–152. [Google Scholar]
- An XH, Li YY, Lu JJ, et al. (2025) BIM+MES-based information management platform for prefabricated buildings, Brick Tile 2025, 4, 124–126+129. https://doi.org/10.16001/j.cnki.1001-6945.2025.04.027. [Google Scholar]
- Zhang JX, Yin ML, Ouyang HY, Wang ZX (2024) Intelligent construction system architecture and development pathways, Constr. Technol. 53, 19, 1–7. [Google Scholar]
- Cheng Y, Zhou BY, Zhang LW, Xie Y (2024) Application of BIM technology in refined management of prefabricated building construction process, Sichuan Cement 2024, 8, 106–108. [Google Scholar]
- Zhu XY, Peng YW (2025) Construction of digital management mode for prefabricated buildings based on BIM, Shanghai Real Estate 2025, 2, 26–29. https://doi.org/10.13997/j.cnki.cn31-1188/f.2025.02.007. [Google Scholar]
- Li XJ (2020) Research on investment risk influence factors of prefabricated building projects, J. Civil Eng. Manag. 26, 7, 599–613. https://doi.org/10.3846/jcem.2020.12917. [CrossRef] [Google Scholar]
- Ng A, Loosemore M (2007) Risk allocation in the private provision of public infrastructure, Int. J. Proj. Manag. 25, 1, 66–76. https://doi.org/10.1016/j.ijproman.2006.06.005. [CrossRef] [Google Scholar]
- Li XJ, Wang C, Mukhtar AK, Hamed HA, Samuel B (2022) Evaluation method for quality risks of safety in prefabricated building construction using SEM-SDM approach, Int. J. Environ. Res. Public Health 19, 9, 5180. https://doi.org/10.3390/IJERPH19095180. [CrossRef] [Google Scholar]
- Liu X (2020) Prefabricated construction process quality influence factors evaluation and application research on, Master’s Degree Thesis, Xihua University. https://doi.org/10.27411/d.cnki.gscgc.2020.000528. [Google Scholar]
- Ren X (2018) BIM-based prefabricated building quality management, Sichuan Cement 4, 202–204. [Google Scholar]
- Kylili A, Fokaides PA, Christou P, Kalogirou SA (2014) Infrared thermography (IRT) applications for building diagnostics: a review, Appl. Energy 134, 531–549. https://doi.org/10.1016/j.apenergy.2014.08.005. [CrossRef] [Google Scholar]
- Faridah I, Norazian MY, Har EAB (2012) Management factors for successful IBS projects implementation, Procedia Soc. Behav. Sci. 68, 99–107. https://doi.org/10.1016/j.sbspro.2012.12.210. [CrossRef] [Google Scholar]
- Han B, Liu X, Wang G, Guo B (2019) System reliability evaluation of prefabricated RC hollow slab bridges considering hinge joint damage based on modified AHP, Appl. Sci. 9, 22, 4841. https://doi.org/10.3390/app9224841. [CrossRef] [Google Scholar]
- Zhou Y, Cai J, Xu Y, Wang Y, Jiang C, Zhang Q (2021) Operation performance evaluation of green public buildings with AHP-fuzzy synthetic assessment method based on cloud model, J. Build. Eng. 42, 102775. https://doi.org/10.1016/J.JOBE.2021.102775. [CrossRef] [Google Scholar]
Les statistiques affichées correspondent au cumul d'une part des vues des résumés de l'article et d'autre part des vues et téléchargements de l'article plein-texte (PDF, Full-HTML, ePub... selon les formats disponibles) sur la platefome Vision4Press.
Les statistiques sont disponibles avec un délai de 48 à 96 heures et sont mises à jour quotidiennement en semaine.
Le chargement des statistiques peut être long.