Open Access
Issue |
Sci. Tech. Energ. Transition
Volume 80, 2025
|
|
---|---|---|
Article Number | 37 | |
Number of page(s) | 12 | |
DOI | https://doi.org/10.2516/stet/2025017 | |
Published online | 03 June 2025 |
- Li Y, Li F, Zou Yu, Ma X, Lv Z, Wu X (2016) Construction safety and quality assessment of prefabricated concrete buildings, Build. Technol 47, 4, 305–309. https://doi.org/10.13731/j.issn.1000-4726.2016.04.004. [Google Scholar]
- Wang P (2019) Analysis of engineering project management and development of prefabricated buildings, Green Build. Mater. 6, 185–186. https://doi.org/10.16767/j.cnki.10-1213/tu.2019.06.139. [CrossRef] [Google Scholar]
- Ding S (2021) Research on the project management mode of the whole industry chain of prefabricated buildings based on BIM, Constr. Econ. 42, 8, 67–71. https://doi.org/10.14181/j.cnki.1002-851x.202108067. [Google Scholar]
- Chen K (2020) Analysis of problems and countermeasures in the development of prefabricated buildings, Econ. Res. Guide 9, 191–193+197. [Google Scholar]
- Li T, You X (2022) Analysis of factors affecting the quality of prefabricated buildings based on Apriori, Tongji Univ. Nat. Sci. Ed. 50, 2, 147–152. [Google Scholar]
- An XH, Li YY, Lu JJ, et al. (2025) BIM+MES-based information management platform for prefabricated buildings, Brick Tile 2025, 4, 124–126+129. https://doi.org/10.16001/j.cnki.1001-6945.2025.04.027. [Google Scholar]
- Zhang JX, Yin ML, Ouyang HY, Wang ZX (2024) Intelligent construction system architecture and development pathways, Constr. Technol. 53, 19, 1–7. [Google Scholar]
- Cheng Y, Zhou BY, Zhang LW, Xie Y (2024) Application of BIM technology in refined management of prefabricated building construction process, Sichuan Cement 2024, 8, 106–108. [Google Scholar]
- Zhu XY, Peng YW (2025) Construction of digital management mode for prefabricated buildings based on BIM, Shanghai Real Estate 2025, 2, 26–29. https://doi.org/10.13997/j.cnki.cn31-1188/f.2025.02.007. [Google Scholar]
- Li XJ (2020) Research on investment risk influence factors of prefabricated building projects, J. Civil Eng. Manag. 26, 7, 599–613. https://doi.org/10.3846/jcem.2020.12917. [CrossRef] [Google Scholar]
- Ng A, Loosemore M (2007) Risk allocation in the private provision of public infrastructure, Int. J. Proj. Manag. 25, 1, 66–76. https://doi.org/10.1016/j.ijproman.2006.06.005. [CrossRef] [Google Scholar]
- Li XJ, Wang C, Mukhtar AK, Hamed HA, Samuel B (2022) Evaluation method for quality risks of safety in prefabricated building construction using SEM-SDM approach, Int. J. Environ. Res. Public Health 19, 9, 5180. https://doi.org/10.3390/IJERPH19095180. [CrossRef] [Google Scholar]
- Liu X (2020) Prefabricated construction process quality influence factors evaluation and application research on, Master’s Degree Thesis, Xihua University. https://doi.org/10.27411/d.cnki.gscgc.2020.000528. [Google Scholar]
- Ren X (2018) BIM-based prefabricated building quality management, Sichuan Cement 4, 202–204. [Google Scholar]
- Kylili A, Fokaides PA, Christou P, Kalogirou SA (2014) Infrared thermography (IRT) applications for building diagnostics: a review, Appl. Energy 134, 531–549. https://doi.org/10.1016/j.apenergy.2014.08.005. [CrossRef] [Google Scholar]
- Faridah I, Norazian MY, Har EAB (2012) Management factors for successful IBS projects implementation, Procedia Soc. Behav. Sci. 68, 99–107. https://doi.org/10.1016/j.sbspro.2012.12.210. [CrossRef] [Google Scholar]
- Han B, Liu X, Wang G, Guo B (2019) System reliability evaluation of prefabricated RC hollow slab bridges considering hinge joint damage based on modified AHP, Appl. Sci. 9, 22, 4841. https://doi.org/10.3390/app9224841. [CrossRef] [Google Scholar]
- Zhou Y, Cai J, Xu Y, Wang Y, Jiang C, Zhang Q (2021) Operation performance evaluation of green public buildings with AHP-fuzzy synthetic assessment method based on cloud model, J. Build. Eng. 42, 102775. https://doi.org/10.1016/J.JOBE.2021.102775. [CrossRef] [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.