Table 7

Index weight.

Criteria layer Indicator layer Weight
Design phase B1 Information synergy C11 0.28
Construction drawing optimization C12 0.16
Component deepening design C23 0.47
3D modeling design C24 0.10
Production and transportation stage B2 Component information ordering management C21 0.20
Component quality control C22 0.22
Component production scheduling C23 0.46
Component transportation information management C24 0.12
Construction phase B3 Data integration management C31 0.24
Construction progress information management C32 0.34
Environmental Monitoring Management C33 0.13
Engineering quantity information management C34 0.20
Construction site planning simulation C35 0.1
Operation and maintenance phase B4 Operation and maintenance system C41 0.3
Key position monitoring and management C42 0.54
Space Operations and Management C43 0.16

Les statistiques affichées correspondent au cumul d'une part des vues des résumés de l'article et d'autre part des vues et téléchargements de l'article plein-texte (PDF, Full-HTML, ePub... selon les formats disponibles) sur la platefome Vision4Press.

Les statistiques sont disponibles avec un délai de 48 à 96 heures et sont mises à jour quotidiennement en semaine.

Le chargement des statistiques peut être long.