Table 7
Index weight.
| Criteria layer | Indicator layer | Weight |
|---|---|---|
| Design phase B1 | Information synergy C11 | 0.28 |
| Construction drawing optimization C12 | 0.16 | |
| Component deepening design C23 | 0.47 | |
| 3D modeling design C24 | 0.10 | |
| Production and transportation stage B2 | Component information ordering management C21 | 0.20 |
| Component quality control C22 | 0.22 | |
| Component production scheduling C23 | 0.46 | |
| Component transportation information management C24 | 0.12 | |
| Construction phase B3 | Data integration management C31 | 0.24 |
| Construction progress information management C32 | 0.34 | |
| Environmental Monitoring Management C33 | 0.13 | |
| Engineering quantity information management C34 | 0.20 | |
| Construction site planning simulation C35 | 0.1 | |
| Operation and maintenance phase B4 | Operation and maintenance system C41 | 0.3 |
| Key position monitoring and management C42 | 0.54 | |
| Space Operations and Management C43 | 0.16 |
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.