Open Access
| Issue |
Sci. Tech. Energ. Transition
Volume 80, 2025
|
|
|---|---|---|
| Article Number | 50 | |
| Number of page(s) | 13 | |
| DOI | https://doi.org/10.2516/stet/2025030 | |
| Published online | 23 September 2025 | |
- Liu Q., Huang J., Ni T., Chen L. (2022) Measurement of China’s Building Energy consumption from the perspective of a comprehensive modified life cycle assessment statistics method. Sustainability 14(8), 4587. https://doi.org/10.3390/su14084587. [Google Scholar]
- Wang X., Xie S., Wei Z., Wang J. (2024) A study on the impact of China’s prefabricated building policy on the carbon reduction benefits of China’s construction industry based on a difference-in-differences method. Sustainability 16, 17, 7606. https://doi.org/10.3390/su16177606. [Google Scholar]
- LI Y., Li F., Zou Y., Ma X., Lu Z., Wu X. (2016) Construction safety and Quality evaluation of prefabricated concrete buildings. Build. Technol. 47, 4, 305–309 (in Chinese). [Google Scholar]
- Zhao Q., Tian Q., Liu Y., Hei X. (2017) Application research of BIM Technology in Construction management under the new standard of green building evaluation. J. Xian Univ. Technol. 33, 2, 211–219 (in Chinese). [Google Scholar]
- Feng X. (2018) Research on application of BIM technology in prefabricated building construction management, Build. Struct. 48, S1, 663–668 (in Chinese). [Google Scholar]
- Minhua P., Shoufeng Z., Xusong W. (2018) Application of BIM technology in prefabricated building design, Build. Struct. 48, S1, 658–662 (in Chinese). [Google Scholar]
- Cao X., Lu X., Wang Y. (2018) Production quality management of prefabricated building components based on BIM-RFID. J. Civil Eng. Manage. 35, 4, 102–106 + 111. [Google Scholar]
- Qi B., Li C. (2014)Research on Whole life Cycle Management of prefabricated buildings based on BIM, Construct. Technol. 43, 15, 25–29 (in Chinese). [Google Scholar]
- Bai S., Zhang Y., Han F., Zhang D., Li W. (2015) Application value analysis of BIM technology in prefabricated buildings, Construct. Econom. 36(11), 106–109 (in Chinese). [Google Scholar]
- Wang S., Zhou Q., Tian D. (2017) Research on the application of BIM technology in prefabricated construction under the background of project general contracting, Eng. Manage. J. 31, 6, 39–44 (in Chinese). [Google Scholar]
- Cao J., Liu L., Miao L., Zhu Q. (2017) Construction of maturity model of public building facilities management, J. Eng. Manage. 31, 2, 59–63 (in Chinese). [Google Scholar]
- Fang W., Xue Q., Wang L. (2017) Research on maturity evaluation of collaborative innovation capability of universities. Sci. Technol. Chin. Univers. 4(Z1), 89–94 (in Chinese). [Google Scholar]
- National Institute of Building Sciences (NIBS) (2007) United States National Building Information Modeling Standard, Version 1, Part 1: Overview, Principles, and Methodologies. Washington: National Institute of Building Sciences. [Google Scholar]
- Succar B., Sher W., Willians A. (2012) Measuring BIM performance: five metrics, Archit. Eng. Design Manage. 8, 120–142. [Google Scholar]
- Wang M., Wang G., Peng L., Xu C., Song J. (2017) Evaluation and empirical research on BIM technology application capability of design enterprises. J. Eng. Manage. 31, 5, 153–158 (in Chinese). [Google Scholar]
- Chen Y., Li D., Yang J. (2019) Research on BIM capability maturity measurement of construction projects based on SEM, J. Civil Eng. Manage. 36, 2, 61–67 + 73 (in Chinese). [Google Scholar]
- Rojas M.J., Herrera R.F., Mourgues C., Ponz-Tienda J.L., Alarcón L.F., Pellicer E. (2019) BIM Use Assessment (BUA) tool for characterizing the system application levels of BIM uses for the planning and design of construction projects. Adv. Civil Eng. 2019, 9094254. [Google Scholar]
- Zhang L., Yu X. (2018) Research on BIM application capability evaluation and Improvement Strategy of Construction Enterprises, Construct. Technol. 47, 9, 123–128 (in Chinese). [Google Scholar]
- Luo L., Li Y., Zhai Y. (2017) Research on BIM lifetime application capability maturity model. J Nanchang Univers (Science Edition) 41, 6, 607–612 + 616 (in Chinese). [Google Scholar]
- Abideen D.K., Yunusa-Kaltungo A., Cheung C., Manu P. (2025) Development and evaluation of a maturity assessment tool for integrating building information modelling into operations and maintenance phase of buildings, Develop. Built Environ. 21, 100619. [Google Scholar]
- Bernhardt C., Akademie der Wissenschaften der DDR Forschungsinstitut für Aufbereitung (1989) Prozessgrundlagen und Technologieentwicklung für die Aufbereitungstechnik : Forschungsergebnisse des Forschungsinstituts für Aufbereitung der Akademie der Wissenschaften der DDR (1. Aufl). Deutscher Verlag für Grundstoffindustrie. [Google Scholar]
- Rahman H.F., Chakrabortty R.K., Ryan M.J. (2020) Memetic algorithm for solving resource constrained project scheduling problems, Autom. Construct. 111, 103052. [Google Scholar]
- Cao P., Cao Z., Huang D., Wang J. (2025) Hybrid model for BIM application maturity in prefabricated buildings: A case study in Xi’an, China, Buildings 15, 8, 1322. https://doi.org/10.3390/buildings15081322. [Google Scholar]
- Succar B., Sher W., Williams A. (2012) Measuring BIM performance: Five metrics. Architect. Eng. Design Manage. 8, 2, 120–142. https://doi.org/10.1080/17452007.2012.659506. [Google Scholar]
- Shi W., Cao J., Zhang Q., Li Y., Xu L. (2016) Edge computing: vision and challenges. IEEE Internet Things J 3, 5, 637–646. https://doi.org/10.1109/JIOT.2016.2579198. [Google Scholar]
- Dais D., Bal I.E., Smyrou E., Sarhosis V. (2021) Automatic crack classification and segmentation on masonry surfaces using convolutional neural networks and transfer learning. Autom. Construct. 125, 103606. [Google Scholar]
- Saaty T.L. (2004) Fundamentals of the analytic network process – Dependence and feedback in decision-making with a single network. J. Syst. Sci. Syst. Eng. 13, 2, 129–157. [Google Scholar]
- Cai W. (1983) Extension set and non-compatible problems, J. Sci. Explor. 1, 83–97. [Google Scholar]
- Chen M. (2021) Evaluating suitability of land for forest landscape restoration using a matter-element model-based methodology. Land Use Policy 107, 105–123. [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.
