Open Access
Table 5
Basic steps of fuzzy integrated evaluation method.
| Step number | Basic steps | Description |
|---|---|---|
| 1 | Building factor sets | According to the risk identification results, establish the corresponding set of risk factors |
| 2 | Determine the weight of each factor | According to the weight determination method, the weight of each factor is calculated |
| 3 | Building evaluation sets | According to the objectives and requirements of risk evaluation, establish evaluation sets |
| 4 | Build the factor set fuzzy relationship matrix | Based on the affiliation of each factor to the evaluation set, a fuzzy relationship matrix is established |
| 5 | Factor weights and fuzzy relationship matrix synthesis | The obtained weights and fuzzy relationship matrix are synthesized by fuzzy mathematical methods |
| 6 | Analytical calculation results | Analyze the calculation results |
Les statistiques affichées correspondent au cumul d'une part des vues des résumés de l'article et d'autre part des vues et téléchargements de l'article plein-texte (PDF, Full-HTML, ePub... selon les formats disponibles) sur la platefome Vision4Press.
Les statistiques sont disponibles avec un délai de 48 à 96 heures et sont mises à jour quotidiennement en semaine.
Le chargement des statistiques peut être long.
