Table 4
Energy consumption scenarios during expressway construction phase.
Scenario sets | Energy consumption scenarios | Energy consumption facilities/projects | Energy consumption intensity (tce/km) |
---|---|---|---|
Expressway trunk lines (80.6%) | Road base engineering | Drainage engineering, road base earth-rock engineering, and soft foundation treatment. | 366.7 |
Road surface engineering | Pavement structure and subgrade, pavement surface layer, and pavement accessory engineering. | 131.8 | |
Road intersection engineering, bridge and culvert engineering | Excavation, island construction, cofferdam installation, sinking wells, piling, grouting, masonry engineering, arch keystone, and steel structure engineering. | 81.1 | |
Traffic engineering and ancillary facilities engineering | Safety facilities and signage, communication system installation, power supply system installation, lighting system installation, optical cable and cable installation, grounding engineering, and green engineering. | 11.2 | |
Temporary engineering | Temporary access road, temporary bridge, dock, building construction, power line construction and demolition, communication line construction and demolition, water supply pipeline construction and demolition, and pre-acceptance maintenance. | 16.8 | |
Tunnels (18.6%) | Tunnel engineering | Tunnel body engineering, tunnel door engineering, auxiliary tunnel engineering, and facility installation. | 140.5 |
Service areas (0.4%) | Vehicle service facilities engineering | Parking lot construction, gas station construction, charging pile installation, vehicle access road construction, and repair shop construction. | 0.56 |
Personnel service facilities engineering | Toilet, canteen, restaurant, shop, hotel, lounge, and medical station construction, pedestrian plaza and walkway construction, and other facility construction | 0.56 | |
Management facilities engineering | Monitoring room, communication equipment room, management office, and staff dormitory construction. | 0.56 | |
Auxiliary facilities engineering | Electrical room construction, garbage classification facility construction, pumping station and other auxiliary room construction, and sewage treatment facility construction. | 0.56 | |
Emergency facilities engineering | Emergency rescue site constructiontoll station. | 0.56 | |
Toll stations (0.4%) | Toll area construction | Toll booth, toll island, and toll canopy construction. | 0.56 |
Toll plaza construction | Widening of roads before and after the toll station. | 0.56 | |
Management building construction | Office, staff dormitory, and monitoring room construction. | 0.56 | |
Auxiliary facilities construction | Garage and kitchen construction, and water, electricity, and gas facility installation. | 1.12 |
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.