Table 1

Risk classification of each risk index.

Risk level Risk-free Low risk Medium risk High risk
Bad behavior handling records No record General misbehavior Gross misconduct Particularly serious misconduct
Delivery timeliness Supplier on time delivery Due to the supplier’s delayed delivery, no more than 1 project unit will be affected within 12 months The supplier delayed delivery due to the cumulative impact on 2 project units within 12 months Due to delayed delivery by the supplier, the cumulative impact on 3 or more project units within 12 months
Service satisfaction 100 points [70, 100] [50, 70] Below 50 points
Quality inspection before delivery Sampling pass rate ≥90%; Reinspection and multiple owner unit testing are qualified Random inspection pass rate (80–90%), but reinspection and multiple owner units test qualified Random inspection pass rate (70–80%), but reinspection and multiple owners of the unit test qualified The pass rate of sampling inspection is less than 70% or the reinspection fails or multiple owner units fail to pass the test
Arrival acceptance Up to standard Below standard
Handover test acceptance Up to standard Below standard
Product operation 100 [40, 100) [0, 40)

Les statistiques affichées correspondent au cumul d'une part des vues des résumés de l'article et d'autre part des vues et téléchargements de l'article plein-texte (PDF, Full-HTML, ePub... selon les formats disponibles) sur la platefome Vision4Press.

Les statistiques sont disponibles avec un délai de 48 à 96 heures et sont mises à jour quotidiennement en semaine.

Le chargement des statistiques peut être long.