Open Access

Table 1

Evaluation index system of BIM application maturity of prefabricated buildings.

Target layer Criteria layer Indicator layer
Prefabricated building BIM application maturity evaluation index A Design phase B1 Information synergy C11
Construction drawing optimization C12
Component deepening design C23
3D modeling design C24
Production and transportation stage B2 Component information ordering management C21
Component quality control C22
Component production scheduling C23
Component transportation information management C24
Construction phase B3 Data integration management C31
Construction progress information management C32
Environmental Monitoring Management C33
Engineering quantity information management C34
Construction site planning simulation C35
Operation and maintenance phase B4 Operation and maintenance system C41
Key position monitoring and management C42
Space Operations and Management C43

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.